AI Infrastructure

Planner

Send Feedback
Help us improve the AI Infrastructure Planner

Facility Design

Design and visualize rack layouts for your AI infrastructure. Drag and drop equipment, validate power and cooling requirements, and optimize your data center footprint.

Import from TCO Analysis

Automatically layout 32 GPU servers, 5 control servers, and 11 storage servers from your TCO configuration.

Configuration

Rack Specs

Equipment

GPU Servers (7)

HGX B300 (8x GPU)

10U14.5kW

HGX H200 (8x GPU)

8U10.2kW

GPU Server (8x H200, 4U)

4U10.0kW

GPU Server (8x RTX Pro 6000, 4U)

4U10.0kW

HGX B200 (8x GPU)

8U14.3kW

GPU Server (8x L40S, 4U)

4U2.8kW

HGX H100 (8x GPU)

8U10.2kW

Control Servers (2)

Control Server (2U)

2U1.2kW

Control Server (1U)

1U0.8kW

Storage (1)

Storage Server (1U)

1U0.8kW

Network (3)

32-Port 400G Switch (1U)

1U1.4kW

64-Port 400G Switch (2U)

2U3.1kW

64-Port 800G Switch (2U)

2U3.0kW

Power Distribution (2)

Vertical PDU (0U, 30kW)

0U0.0kW

Horizontal PDU (2U, 17kW)

2U0.0kW

Cooling (1)

Cooling Distribution Unit (4U)

4U0.5kW

Drag to rack slots

Rack Layout